Ok, so, it's been a really long time since I updated anything. Not that nothing has happened - far to the contrary! Lots of things have happened! However, one unfortunate occurrence is that the blogger app for my phone no longer seems to want to upload pictures. That means that I need to copy pictures that I take with my phone to my desktop to add them to a post. Which explains why this post that I started in July is only being posted now.
That out of the way, here's the bit from July:
This is the hottest part of the year, but I'm still pushing ahead with construction. I could be working more, but it's been 100 degrees outside, so forget that!
As noted in the title, I've made some serious headway, at least as far as construction is concerned.
Electrical: Finished, except for tying it into the main house wiring.
Sewage and sewage vents: the new bathroom is 100% complete, and the master bathroom has the major sewage pipes in. Huzzah!
Framing: exterior framing is 100% finished, and interior framing is done except for where I need to make holes in walls (such as the nook, or the bedroom-to-closet doorway).
Siding: In progress; of the seven sections, two are complete, one is nearly complete, and one is partially complete. The "hard spot" is one of the ones that I finished; the exterior door is in, and all the siding has been installed around it. Huzzah!
2015-11-08
2015-04-10
Progress! (or) Non-Livable Space
It's been over a year since I wrote anything here. That is a really long time, and I'm sorry that I haven't been able to get much done. There are all sorts of projects that have been left unfinished, but sometimes, life gets in the way.
That said, we've finally begun step one of The Big Project! As a planner, a dreamer, and a super-logical person, I have always had big plans, and this house is no exception. I have a huge spreadsheet with all sorts of bells and whistles that tells me what I should work on, what projects cost, and even how far I have to go before I am done with everything. It's a staggeringly huge project, overall. That's why I've chopped it into smaller pieces. For instance, the top-level plan includes "Finish Upstairs", which has the sub-task "Build Addition", which includes "Complete new bathroom", which includes "install toilet"... you get the idea. Well, up to now, I've been stuck with working on all those smaller pieces: making drawers, filling holes, that sort of thing. Today, however, I am pleased to show you the really, really big piece I've been working on.
That said, we've finally begun step one of The Big Project! As a planner, a dreamer, and a super-logical person, I have always had big plans, and this house is no exception. I have a huge spreadsheet with all sorts of bells and whistles that tells me what I should work on, what projects cost, and even how far I have to go before I am done with everything. It's a staggeringly huge project, overall. That's why I've chopped it into smaller pieces. For instance, the top-level plan includes "Finish Upstairs", which has the sub-task "Build Addition", which includes "Complete new bathroom", which includes "install toilet"... you get the idea. Well, up to now, I've been stuck with working on all those smaller pieces: making drawers, filling holes, that sort of thing. Today, however, I am pleased to show you the really, really big piece I've been working on.
Subscribe to:
Posts (Atom)